Crochet & knitting calculators that do the math for you

No more guessing how many skeins to buy or what hook or needle to grab. Fifty free tools for gauge, yarn substitution, sizing, and shaping math — built for makers, not spreadsheets.

New to Crochet or Knitting?

Start here — no experience needed. What to buy, how to hold everything, and a first project you can finish.

Find It on Amazon

Search Amazon directly for yarn, hooks, needles, and notions.

From Our Craft Room

Crochet Project Planner cover

Crochet Project Planner

Write-in project planner — 120 blank pages to track every skein, hook size, gauge swatch, and stitch count.

$13.99 on Amazon →

Knitting Project Planner cover

Knitting Project Planner

Write-in project planner — 120 blank pages to track every skein, needle size, gauge swatch, and row count.

$13.99 on Amazon →

Crochet tools

Guides & Reference

Yarn Care Guide

How to wash, dry, and block your finished project by fiber, plus yarn label symbols.

Crochet Stitch Guide

Every basic stitch, its abbreviation, and how to work it, step by step.

Crochet Stitch Diagram Chart

The symbol key for reading motif, doily, and granny square diagrams.

Hook Size Chart

Convert between US, metric, and old UK/Canada hook sizes.

Yarn & Hook Converter

Find the right hook size and gauge range for any yarn weight.

Project Size Chart

Standard finished dimensions for blankets, scarves, and more.

Everyday Tools

Gauge Calculator

Convert a pattern's stitch count to match your own swatch gauge.

Row Counter

A simple tap counter for rows or rounds that saves your progress on this device.

Repeat Counter

Track "repeat rows X–Y, N times" patterns: current repeat and current row.

Chain Length Calculator

Get the exact starting chain for any width, stitch, and gauge.

Yards to Meters Converter

Instant, two-way yarn length conversion, plus common skein lengths.

Yardage Estimator

Estimate how many skeins you need for a blanket, scarf, or garment.

Yarn Project Finder

Enter what you've got left, see which projects it's actually enough for.

Stitch Repeat Calculator

Nearest valid stitch count for a "multiple of X, plus Y" repeat.

Pattern Conversion Calculator

Convert pattern text between US and UK crochet terms, plus a full chart.

Motifs & Amigurumi

Granny Square Calculator

Figure out how many squares you need for your target blanket size.

Flat Circle Calculator

Stop your circles from ruffling or cupping with a gauge-matched round plan.

Amigurumi Round Counter

Generate a round-by-round stitch count plan for any sphere size.

Safety Eye Placement Calculator

Recommended eye spacing from head size and eye size, in inches, mm, or stitches.

Stuffing Estimator

Estimated fiberfill weight for any amigurumi shape, size, and firmness.

Finished Size Calculator

Estimate plush dimensions from your yarn, hook, gauge, and pattern's stitch count.

Shaping & Project Planning

Decrease Calculator

Exactly which rows to decrease on to hit a target stitch count.

Increase Calculator

Exactly which rows to increase on to hit a target stitch count.

Evenly Spaced Increase/Decrease Calculator

Exact spacing for "increase N sts evenly across" instructions.

Temperature Blanket Planner

Estimate days per color range and how much yarn of each to buy.

Color Stripe Planner

Full stripe sequence and total rows (and yarn) needed per color.

Leftover Yarn Calculator

Weigh your scraps, get a real yardage, and see which patterns it's enough for.

Yarn Substitution Calculator

Check whether swapping yarns will work, based on weight category and gauge.

Garments & Advanced Projects

Hat Size Calculator

Cast-on count, body height, and crown decreases for any head size.

Crochet Hat Pattern Generator

A full round-by-round beanie pattern, not just a stitch count.

Beer Bottle Cozy Generator

A full tapered cozy pattern sized to a longneck, bomber, or wine bottle.

Beer Can Cozy Generator

A full straight-tube cozy pattern sized to a standard can or tallboy.

Blanket Border Calculator

Stitch counts per side and corner spacing for a flat, non-rippling border.

Granny Square Join Calculator

Estimate how much yarn your join will use before you start seaming.

Garment Resizer

Scale a garment pattern up or down to your exact measurements.

Sleeve Taper Calculator

Exact rows to shape from wrist to upper arm, accounting for RS-only shaping.

Sweater Ease Calculator

Finished bust measurement to knit or crochet toward, for any fit style.

Project Planner

Skeins, stitches, rows, weight, and estimated hours for a whole project at once.

Knitting tools

Guides & Reference

Yarn Care Guide

How to wash, dry, and block your finished project by fiber, plus yarn label symbols.

Knitting Stitch Guide

Every basic stitch and technique, with how to work it, step by step.

Knitting Chart Symbols

The symbol key for reading lace and colorwork charts.

Knitting Needle Size Chart

Convert between US, metric, and old UK/Canada needle sizes.

Yarn & Needle Converter

Find the right needle size and stockinette gauge for any yarn weight.

Project Size Chart

Standard finished dimensions for blankets, scarves, and more.

Everyday Tools

Knitting Gauge Calculator

Convert a pattern's stitch count to match your own swatch gauge.

Row Counter

A simple tap counter for rows or rounds that saves your progress on this device.

Repeat Counter

Track "repeat rows X–Y, N times" patterns: current repeat and current row.

Cast-On Calculator

Stitch count for any width, plus exact long-tail cast-on length.

Yards to Meters Converter

Instant, two-way yarn length conversion, plus common skein lengths.

Knitting Yardage Estimator

Estimate how many skeins you need for a blanket, scarf, or sweater.

Yarn Project Finder

Enter what you've got left, see which projects it's actually enough for.

Stitch Repeat Calculator

Nearest valid stitch count for a "multiple of X, plus Y" repeat.

Shaping & Project Planning

Decrease Calculator

Exactly which rows to decrease on to hit a target stitch count.

Increase Calculator

Exactly which rows to increase on to hit a target stitch count.

Evenly Spaced Increase/Decrease Calculator

Exact spacing for "increase N sts evenly across" instructions.

Temperature Blanket Planner

Estimate days per color range and how much yarn of each to buy.

Color Stripe Planner

Full stripe sequence and total rows (and yarn) needed per color.

Leftover Yarn Calculator

Weigh your scraps, get a real yardage, and see which patterns it's enough for.

Yarn Substitution Calculator

Check whether swapping yarns will work, based on weight category and gauge.

Socks

Sock Size Calculator

Cast-on count and foot length sized to an actual foot measurement.

Heel Turn Calculator

Row-by-row short-row heel turn instructions for any heel stitch count.

Toe Decrease Calculator

Round-by-round wedge toe shaping plan down to a grafting-ready count.

Garments & Advanced Projects

Knit Hat Calculator

Top-down crown increases, body height, and brim for any head size.

Blanket Border Calculator

Pick-up stitch counts per side and mitered corner increases for a flat border.

Knit Square Join Calculator

Estimate how much yarn your seaming method will use before you start.

Knitting Pattern Resizer

Scale a pattern up or down to your exact measurements.

Sleeve Taper Calculator

Exact rows to shape from wrist to upper arm, accounting for RS-only shaping.

Sweater Ease Calculator

Finished bust measurement to knit or crochet toward, for any fit style.

Project Planner

Skeins, stitches, rows, weight, and estimated hours for a whole project at once.

From Our Craft Room: Project Planners

Write-in project planners to track every skein, hook/needle size, gauge swatch, and finished project.

Crochet Project Planner cover

Crochet Project Planner

$13.99 on Amazon →

Knitting Project Planner cover

Knitting Project Planner

$13.99 on Amazon →

Why gauge math matters

Every crochet or knitting pattern is written around one specific gauge: the stitch and row count a designer measured with their own yarn, hook or needle, and tension. Pick up the exact materials listed and you can still land 10-15% off that number, because tension is personal — how tightly you hold your working yarn and how hard you pull each stitch changes the finished size more than the materials do. A 4-inch swatch that comes out at 15 stitches instead of the pattern's 16 doesn't sound like much, but scaled across a 40-inch blanket width that's a difference of over two and a half inches, and across a fitted garment it can mean the difference between something that fits and something that doesn't.

That's the actual job these tools do: take the ratio between your gauge and the pattern's gauge (or between a yarn's suggested hook/needle and the one in your stash, or between a magic ring and the diameter you're trying to hit) and turn it into a concrete number of stitches, rounds, or skeins. None of it is guesswork once you have real measurements to feed in — it's the same proportional math experienced makers eventually do by hand, just faster and without a calculator app open in another tab.

Getting an accurate swatch

Work a swatch at least 5 inches square in the actual stitch pattern the project uses, wash or block it the way you'll treat the finished piece, then measure the middle 4 inches rather than the edges, which tend to curl or flare. Skipping the wash-and-block step is one of the most common reasons a "correct" gauge swatch still produces a finished project that doesn't match — some fibers, especially wool blends, relax or grow noticeably once wet, and knit fabric in particular can change size substantially after blocking.